Galbraith Mountain Trail Plan 09-10
WMBC XC Crew Trail Maintenance & Building List
XC Trail Crew 2009-10
Trail Inventory by TTF
• Photos
• Inspections/repair reports
• Formatted
Drainage Banditos
Keystone Cut Bridge
Mirror Pond
• Flag Route
• Check feasibility and time requirements
•
Lost Giants to Rock & Roll Connector
• Walk line
• Check feasibility and time requirements
•
Whoopsee Connector
• Trail dual use factor
Oly to Bears Connector
Three Pigs Reroutes
SST/Cabin/Candy
• Flag connector to SST
• Incorporate reroute to Cabin and Bears
Lost Giants Bridge on South End
• David, Russ, Bellis will crew
Miranda Maintenance
• Cribbing
• Switchback re-vegetation and barriers
Hush Hush
• Cribbing
• General finish work
Signage
• Source and replace trailhead signs
• Source and place new FR Caution Signs
• Kiosk-Quarterly (or more frequent) posters
• Color Loops for Bunny Trails/Kaya/Art’s
WMBC FR Crew Trail Maintenance & Building List
Fall 2009 – Spring 2010 Projects:
Evolution
• Maintenance
• Rebuild features
• Reroute exit towards PT
Scorpion
• Maintenance
• Replace down ramp on second stump roll
• Armor steep down at upper section exit point
• Reroute into lower section
• Small reroute coming out of the ravine
Cheech & Chongs Wild Ride
• Maintenance
• Construct rock to wood wall ride
• Golden arches skinny
Meth Lab
• Maintenance
Mullet
• Maintenance
• A couple small reroutes on the upper section
• Pump bumps and berms to increase flow on upper section
• Continue to buff and dial lower section
Luge
• Reroutes to extend trail and better flow
• Re/build berms and hits
911
• Rebuild features
• Reroute lower section to add more trail (New)
SST
• Continue to buff/increase flow
• Adopt lower section (Bonanza) on Park/Skeers land
View spot – Mullet connector (New)
• Use 12 Monkeys zone – to road – drop back in from Art zone
• Scout, scout scout!!!
• Build a bridge over Wonderland
• Use a machine to build a dirt merchant style jump trail
Lower Luge to Kiosk (New)
• Possibly combine with DC’s line? (it makes more sense than both crew’s
building their own line thru the challenging terrain lower on the hill)
The Shit - Lower (New)
• Reroute so it avoids crossing the creek and exits on the road below
• Decommission unused line on other side of the creek
Bob’s
• Maintenance
• Reroutes to increase flow
Grasshopper
• Russ Barlow is back in the game
Flying Squirrel
• Rehab this as a DH line
Machine Built Trails
Get the right machine and pick the right zone.
• 12 Monkeys to Mullet line
• Lower 911 reroute
• Luge reroutes
• Dual Slalom/4X/Pump Track
• DC’s lower line
Mark Salisbury has a mini-excavator he said we could borrow/use for a
couple weeks. He will also provide machine transportation to and from
the hill.
We will scout and route, clip and clear lines so they are walkable for
others to check out.
We propose hiring D-Mac Trail Inc. to provide professional consultation
regarding the feasibility of our scouted lines and to provide an
estimate on time and cost of the projects.
Fund-raising to help cover costs.
Hire an operator to start the work and train trail crew leaders.
Build in March & April.
|